Department Logo
Banner Images Right

GATE FEES ARE APPLICABLE AT ALL SCALED SITES
PRICES EFFECTIVE JULY 1, 2009
(To be notified of any changes to this page via email, you can now SUBSCRIBE)

Hours of Operations:                   El Sobrante:     6:00 a.m. to 6:00 p.m. Closed Sunday
                                                       Badlands:     6:00 a.m. to 4:30 p.m. Closed Sunday
                                                Lamb Canyon:     6:00 a.m. to 4:30 p.m. Closed Sunday
                                                            Blythe:     8:00 a.m. to 4:00 p.m. Closed Sunday
                                                             

No charge loads:
Any vehicle hauling 2 or less large trash bags or up to 2 cathode ray tube (CRT) devices (e.g. TVs or computer monitors) per day

Minimum Loads:
Routine Refuse - $8.00 per load for up to .4 tons (800 pounds)
Loads containing > 50% Green Waste - $11.00 per load for up to .4 tons (800 pounds)
Hard to Handle - $11.00 per load for up to .25 tons (500 pounds)

Per Ton Rate:
$34.37 per ton for Routine Refuse
$44.37 per ton for Green Waste (>50%)
$45.83 per ton for Hard to Handle
$96.85 per ton for Tires (see below)

Routine Refuse includes, but is not limited to the following:
Miscellaneous Routine Refuse
Concrete or Asphalt           
Clean fill dirt
Appliances
Construction/Demo (75% of load less than 300 pound pieces)
Chemical Toilets/Septic Tank Waste/Grease Traps (Blythe only)                              

Green Waste includes, but is not limited to the following:
Wood                            Wood chips                     Brush
Tree Trimmings              Grass                              Palm fronds

Hard to Handle includes, but is not limited to the following:
Herbicide containers (triple-rinsed & punctured)                          
Sewer Screenings/Grit sand
Dead animals                       
Other items requiring immediate burial
Construction/Demolition (25% of load more than 300 pound pieces)
Rootballs or tree trunks (over 200 pounds each – 7 feet long or 24 inch diameter)
All End Dump loads (special handling is required for safety)
Treated Wood Waste (e.g. railroad ties, grape stakes, etc) (Badlands and Lamb Canyon only)

Tires- (accepted at Badlands, Blythe, and Lamb Canyon)
Vehicles hauling loads of more than 9 standard vehicle tires and/or equipment tires (Manifest will be required) and any load with 1 or more oversize tires, will be charged at the per ton rate for Tires.  Tires cannot exceed 4 feet in diameter and/or 200lbs each.

Surcharges:
$0.75 charge for sale of Orange Safety Vest (per vest)
$1.00 per tire for loads containing up to 9 standard vehicle tires
$10.00 for uncovered loads
Late charges for unloading - $60.00 (16-30 minutes past closing)
                                                  $120.00 (31 minutes or more)

 

 

Riverside County Waste Management Department 14310 Frederick St. Moreno Valley, Ca. 92553 - (951) 486-3200

Contact Us
| Website Feedback | Landfill Feedback
Copyright © 2001-2010 Riverside County Waste Management Department 'All Rights Reserved'
Privacy | Disclaimer email icon